Reset

101 reports found

Assessment
Hospital Breach Candy, Mumbai logo
Photograph of Hospital Breach Candy, Mumbai

Hospital Breach Candy, Mumbai

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 60% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 5,256 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator + Shower Regulator
Projection Basis 100 rooms (projection)
Projected Cost Savings ₹94,608
Assessment
Hotel Bhagirath, Dehradun logo
Photograph of Hotel Bhagirath, Dehradun

Hotel Bhagirath, Dehradun

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 10.8 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 56% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 4,380 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹78,840
Assessment
Hotel Nexus, Rajkot logo
Photograph of Hotel Nexus, Rajkot

Hotel Nexus, Rajkot

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 65% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 5,694 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator + Shower Regulator
Projection Basis 100 rooms (projection)
Projected Cost Savings ₹1,02,492
Assessment
Mosaic Hotel, Mussoorie logo
Photograph of Mosaic Hotel, Mussoorie

Mosaic Hotel, Mussoorie

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9.6 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 50% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,504 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹63,072
Assessment
Days Hotel, Jaipur logo
Photograph of Days Hotel, Jaipur

Days Hotel, Jaipur

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 65% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 5,694 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,02,492
Assessment
Fairfield Marriott, Dehradun logo
Photograph of Fairfield Marriott, Dehradun

Fairfield Marriott, Dehradun

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 65% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 5,694 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator + Shower Regulator
Projection Basis 100 rooms (projection)
Projected Cost Savings ₹1,02,492
Assessment
Max Hospital, Rajpur Road - Dehradun logo
Photograph of Max Hospital, Rajpur Road - Dehradun

Max Hospital, Rajpur Road - Dehradun

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 14.4 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 71% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 7,446 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator + Shower Regulator
Projection Basis 100 rooms (projection)
Projected Cost Savings ₹1,34,028
Assessment
Starz Clark Inn Hotel, Mussoorie logo
Photograph of Starz Clark Inn Hotel, Mussoorie

Starz Clark Inn Hotel, Mussoorie

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 14.4 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 71% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 7,446 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,34,028
Assessment
Nks Hospital, Delhi logo
Photograph of Nks Hospital, Delhi

Nks Hospital, Delhi

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9.6 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 56% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,942 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹70,956
Call us