Reset

101 reports found

Assessment
Antilia Hotel, Sonipat logo
Photograph of Antilia Hotel, Sonipat

Antilia Hotel, Sonipat

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9.6 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 56% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,942 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹70,956
Assessment
Mukesh Patel School Of Technology, Mumbai logo
Photograph of Mukesh Patel School Of Technology, Mumbai

Mukesh Patel School Of Technology, Mumbai

Education

MEASURED FLOW ASSESSED SOLUTION

BEFORE 13.2 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 64% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 6,132 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,10,376
Assessment
Hotel The Ramayana, Ayodhya logo
Photograph of Hotel The Ramayana, Ayodhya

Hotel The Ramayana, Ayodhya

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 65% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 5,694 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,02,492
Assessment
Hotel Malbork Inn, Delhi logo
Photograph of Hotel Malbork Inn, Delhi

Hotel Malbork Inn, Delhi

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 10.2 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 59% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 4,380 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹78,840
Assessment
Park Hospital, Faridabad logo
Photograph of Park Hospital, Faridabad

Park Hospital, Faridabad

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9.6 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 56% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,942 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹70,956
Assessment
Ramada Hotel, Varanasi logo
Photograph of Ramada Hotel, Varanasi

Ramada Hotel, Varanasi

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 65% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 5,694 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,02,492
Assessment
S K Premium, Hari Nagar logo
Photograph of S K Premium, Hari Nagar

S K Premium, Hari Nagar

Commercial

MEASURED FLOW ASSESSED SOLUTION

BEFORE 19.2 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 78% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 10,950 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,97,100
Assessment
Hotel Courtyard Marriott, Amritsar logo
Photograph of Hotel Courtyard Marriott, Amritsar

Hotel Courtyard Marriott, Amritsar

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 8.4 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 43% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 2,628 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹47,304
Assessment
Shiv Vilas Hotel Jaipur logo
Photograph of Shiv Vilas Hotel Jaipur

Shiv Vilas Hotel Jaipur

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 65% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 5,694 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,02,492