Reset

101 reports found

Assessment
Hyatt Place, Haridwar logo
Photograph of Hyatt Place, Haridwar

Hyatt Place, Haridwar

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 14.4 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 67% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 7,008 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,26,144
Assessment
Jolly Grant Hospital, Dehradun logo
Photograph of Jolly Grant Hospital, Dehradun

Jolly Grant Hospital, Dehradun

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9.6 LPM Flow Rate
›
AFTER 4.4 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 54% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,796 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹68,328
Assessment
Hotel Voco, Amritsar logo
Photograph of Hotel Voco, Amritsar

Hotel Voco, Amritsar

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 53% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,504 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator + Shower Regulator
Projection Basis 100 rooms (projection)
Projected Cost Savings ₹63,072
Assessment
Jsr Continental Dehradun logo
Photograph of Jsr Continental Dehradun

Jsr Continental Dehradun

Commercial

MEASURED FLOW ASSESSED SOLUTION

BEFORE 15.6 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 73% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 8,322 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,49,796
Assessment
Chunda Palaca Hotel, Udaipur logo
Photograph of Chunda Palaca Hotel, Udaipur

Chunda Palaca Hotel, Udaipur

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 18 LPM Flow Rate
›
AFTER 4.6 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 74% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 9,782 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,76,076
Assessment
Hyatt Place, Haridwar logo
Photograph of Hyatt Place, Haridwar

Hyatt Place, Haridwar

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 14.4 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 67% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 7,008 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,26,144
Assessment
Ramada Hotel, Mussoorie logo
Photograph of Ramada Hotel, Mussoorie

Ramada Hotel, Mussoorie

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 13.2 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 68% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 6,570 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,18,260
Assessment
Sir Ganga Ram Hospital, Rajinder Nagar, Delhi logo
Photograph of Sir Ganga Ram Hospital, Rajinder Nagar, Delhi

Sir Ganga Ram Hospital, Rajinder Nagar, Delhi

Commercial

MEASURED FLOW ASSESSED SOLUTION

BEFORE 13.2 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 68% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 6,570 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,18,260
Assessment
Park Inn By Radisson Delhi logo
Photograph of Park Inn By Radisson Delhi

Park Inn By Radisson Delhi

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 14.5 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 67% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 7,081 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,27,458