Reset

101 reports found

Assessment
ANTILIA SONIPAT logo
Photograph of ANTILIA SONIPAT

ANTILIA SONIPAT

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9.6 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 56%-75% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,942 KL/YEAR
Assessed Solution 4 LPM FOAM AERATOR , 2 LPM SPRAY AERATOR
Projection Basis 100 UNITS
Projected Cost Savings ₹70,956 - ₹94,608
Assessment
AMRITA HOSPITAL logo
Photograph of AMRITA HOSPITAL

AMRITA HOSPITAL

Hospital

MEASURED FLOW ASSESSED SOLUTION

BEFORE 14.4 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 67% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 7,008 Litres
Assessed Solution 4 LPM Faucet Aerators
Projection Basis 100
Projected Cost Savings 1,26,144
Installation
Hyatt Centric Dehradun logo
Photograph of Hyatt Centric Dehradun

Hyatt Centric Dehradun

Luxury Hotel

BEFORE AFTER RESULTS

BEFORE 10.8 LPM Flow Rate
›
AFTER 4.2 LPM Flow Rate
›
FLOW REDUCTION 55% From Initial Flow

PROJECT METRICS

Annual Water Saved 6,745 KL/Year
Product Installed 4 LPM Foam Faucet Aerator
Fixtures Installed 140
Estimated Annual Cost Savings ₹1,21,410
Assessment
Ginger Hotel Nilam Chowk, Faridabad logo
Photograph of Ginger Hotel Nilam Chowk, Faridabad

Ginger Hotel Nilam Chowk, Faridabad

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12 LPM Flow Rate
›
AFTER 4.4 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 63% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 5,548 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹99,864
Assessment
Hotel Orana, Arunum Maya New Delhi logo
Photograph of Hotel Orana, Arunum Maya New Delhi

Hotel Orana, Arunum Maya New Delhi

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 65% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 5,694 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,02,492
Assessment
Aastha Hospital, Delhi logo
Photograph of Aastha Hospital, Delhi

Aastha Hospital, Delhi

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9.6 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 56% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,942 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹70,956
Assessment
Antilia Hotel, Sonipat logo
Photograph of Antilia Hotel, Sonipat

Antilia Hotel, Sonipat

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9.6 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 56% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,942 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹70,956
Assessment
Kailash Hospital, Dehradun logo
Photograph of Kailash Hospital, Dehradun

Kailash Hospital, Dehradun

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 14.4 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 67% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 7,008 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,26,144
Assessment
Kailash Hospital, Sector 71 logo
Photograph of Kailash Hospital, Sector 71

Kailash Hospital, Sector 71

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 19.2 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 75% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 10,512 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,89,216
Call us