101 reports found

Assessment
Cocoon Hospital Faridabad logo
Photograph of Cocoon Hospital Faridabad

Cocoon Hospital Faridabad

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 14.4 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 67% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 7,008 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,26,144
Assessment
Savoy Hotel, Mussoorie logo
Photograph of Savoy Hotel, Mussoorie

Savoy Hotel, Mussoorie

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9.6 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 56% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,942 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹70,956
Assessment
SRS Hospital, Noida logo
Photograph of SRS Hospital, Noida

SRS Hospital, Noida

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 19.2 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 75% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 10,512 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,89,216
Assessment
Hotel Fairfield, Lucknow logo
Photograph of Hotel Fairfield, Lucknow

Hotel Fairfield, Lucknow

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 6 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 30% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 1,314 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹23,652
Assessment
Red Fox Hotel, Jaipur logo
Photograph of Red Fox Hotel, Jaipur

Red Fox Hotel, Jaipur

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 18 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 73% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 9,636 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,73,448
Assessment
Sarovar Portico, Haridwar logo
Photograph of Sarovar Portico, Haridwar

Sarovar Portico, Haridwar

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 9.6 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 50% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 3,504 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹63,072
Assessment
Hotel Madin, Varanasi logo
Photograph of Hotel Madin, Varanasi

Hotel Madin, Varanasi

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 65% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 5,694 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,02,492
Assessment
Hotel Jageer Palace, Mayapuri, New Delhi logo
Photograph of Hotel Jageer Palace, Mayapuri, New Delhi

Hotel Jageer Palace, Mayapuri, New Delhi

Hospitality

MEASURED FLOW ASSESSED SOLUTION

BEFORE 12.8 LPM Flow Rate
›
AFTER 4.2 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 67% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 6,278 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,13,004
Assessment
Eternal Hospital, Jaipur logo
Photograph of Eternal Hospital, Jaipur

Eternal Hospital, Jaipur

Healthcare

MEASURED FLOW ASSESSED SOLUTION

BEFORE 15.6 LPM Flow Rate
›
AFTER 4.8 LPM With Aerator
›
POTENTIAL FLOW REDUCTION 69% From Initial Flow

PROJECTED ANNUAL IMPACT

Projected Water Savings 7,884 KL/year
Assessed Solution 4 LPM Foam Faucet Aerator
Projection Basis 100 fixtures (projection)
Projected Cost Savings ₹1,41,912